We flew back in from Darwin at 6.20 am this morning, it was a long flight with the kids. I had the day off, but had booked the kids into childcare so that I could get some sleep. On my way back home after dropping the boys off I went by the block.
I was delightfully surprised to find them doing the trench work for the sewer,and we have a PORT-A-LOO !! we are a real building site now :)
I spoke to the guys doing the trench work about where they where laying the pipe, I pointed out to them that on there designs they had it going very close along the front of the house. “Oh he said, I hadn’t noticed that” so good thing I picked up on that one, otherwise we would be trying to put in a retaining wall to find a ruddy great sewer pipe in the way.
Gee it’s a good thing I paid all that money for a retaining wall with scree and piping and stuff running behind it. Can you see the scree dug out to the side there *sigh*
They also managed to bury all the orange plastic you can see, that is supposed to be up against the slab. I am going to have to dig it up again before doing any paving or concreting :(